At 7:00 a.m. on December 16, the Da Dang hydroelectric tunnel (Lat commune, Lac Duong district, Lam Dong province) suddenly collapsed while more than 30 workers were working inside.
At 7:00 a.m. on December 16, the Da Dang hydroelectric tunnel (Lat commune, Lac Duong district, Lam Dong province) suddenly collapsed while more than 30 workers were working inside.
For many hours afterward, Lam Dong’s large rescue force tried to reach the victim but failed.
The 12 victims were completely isolated from the outside world.
For many hours afterward, Lam Dong’s large rescue force tried to reach the victim but failed.
The 12 victims were completely isolated from the outside world.
On December 17, the rescue continued with the presence of many engineering forces, miners, Ho Chi Minh City police… In addition to the complex geology with sand and orphan rocks, another threat to
Authorities offered three options.
The same evening, the rescue made new progress when a small light bulb connected to an electric wire was successfully threaded through the newly drilled iron pipe, passing through the other end to give the victims some light.
On December 17, the rescue continued with the presence of many engineering forces, miners, Ho Chi Minh City police… In addition to the complex geology with sand and orphan rocks, another threat to
Authorities offered three options.
The same evening, the rescue made new progress when a small light bulb connected to an electric wire was successfully threaded through the newly drilled iron pipe, passing through the other end to give the victims some light.
At this time, the water in the tunnel where the victims were trapped was up to 1.4 m.
At this time, the water in the tunnel where the victims were trapped was up to 1.4 m.
All three drilling directions from the front (creating a tunnel pass through the collapse area), back and above continue to be carried out to reach the location of the 12 victims.
All three drilling directions from the front (creating a tunnel pass through the collapse area), back and above continue to be carried out to reach the location of the 12 victims.
At 5:00 p.m. on December 18, after drilling 40 meters from the top of the hill out of 70 meters, the drill bit broke.
At 5:00 p.m. on December 18, after drilling 40 meters from the top of the hill out of 70 meters, the drill bit broke.
Huu Cong – An Nhon Graphics: Xuan Viet